Welcome to the North Central Missions Center Website!
Sunday, September 05, 2010
Verse of the day
|
During RenovationRenovation has begun on the new office of the North Central Missions Center. Check back for up to date photos of the exciting work being done on the North Arnold Mill property. ![]() PlansIn order to begin, plans must be made over coffee. Alan Morris and Red Meador discuss the task at hand. ![]() AlanThe first course of action was to deconstruct before reconstructing. Before walls can be built, partitions must come down. ![]() Alan 2Two partitions are down and two more to go. Curtis and Alan removed the partitions carefully so they could be reused elsewhere. ![]() PartitionsFor now the partitions are laid in the worship center. ![]() GregGreg King is serving as the point man for the renovation project. Here he prepares to open the wall into the worship center for overflow seating. ![]() Greg 2Greg always measures twice and cuts once. ![]() HeathHeath King uses a template for cutting an arch above the doorway. ![]() Classroom 2Progress thus far on one side of the wall. An electrician will need to move wires before more cutting is done. Once complete a partition will be installed. ![]() Classroom 1Instead of doing a full wall removal, a window will be installed for viewing access into the worship center. A speaker with volume control is already installed in the room. ![]() KitchenThe kitchen will also have access to the worship center. This will be convenient for those serving food in the large room. Plumbing must be rerouted for the sink. ![]() OfficeThe reception office has been made accessible with an opening. Later a pull down door will be installed over the desk. ![]() Inside OfficeA window for viewing will be installed in the left opening. This will enable Janice to see who is at the door in the foyer area. ![]() Kitchen 2The plumbing is complete, the cabinets are moved and the openings are ready for the doors. ![]() Classroom 2The wall for classroom 2 is complete and is ready for a door. Also the opening into the worship center is complete and is ready for the partition. The doors and partitions are being reused for the project. ![]() OfficeDrywall has been installed into the openings so the windows and doors can be installed later. ![]() ArchThe arch at the foyer is complete and drywall has been applied. The dramatic effect will be nice as people enter the front door. ![]() Arch 2Another arch is complete at the end of the hallway leading to the rear doors and more offices. The wall beyond the arch has been installed with openings for doors. ![]() WindowThe crying room window is complete with drywall in classroom 1. ![]() OfficesThe two rear offices across from the kitchen will house the banner printer and the associates office. ![]() ArchesFrom the foyer, both arches are easily seen down the hall to the rear of the building. The offices are on the right with classrooms and nursery on the left. ![]() FoyerJanice's viewing window looks into the office. ![]() Overflow SeatingThe opening into classroom 2 will allow for overflow seating in the worship center for church plants, meetings, and banquets. ![]() Kitchen DoorThe kitchen door and opening is complete and ready for the doors. The sound system still needs to be moved to the opposite corner of the worship center. ![]() LightingThe sanctuary lighting has been updated and the window into classroom 1 is ready for the next step. ![]() |
|



























